Social Icons

--

EMPLOYMENT HISTORY


 EMPLOYMENT HISTORY



http://www.skec.com/company/ceo.asp2015 – Present                                    SK & EC




Piping Supervisor
Career summary:
Planning with engineers, construction activities of the project and reviewing proper field piping installation to:

• Provide direct leadership to the Piping and Welding Team, ensuring that polices and procedures are followed and best practices are implemented
• Coach, mentor and promote the development of direct reports and proactively address technical and behavioural performance concerns
• Effectively manage the budget and staffing schedule of the Piping and Welding Team, as well as capital projects work assigned to the Asset Integrity department
• Implement the installation program within the plant area, supervise shutdowns, turnarounds and manage unplanned breakdowns
• Regularly communicate progress and issues associated with the Piping and Welding Team to the Manager, Asset Integrity and other stakeholders as assigned
• Supervise the HYDRO TEST packages be completed in field on time and making the logistic to the documents without delays.

PUNCH CLEARER, Able to make contribution and make decisions in actions that require immediate solutions. 
• Identification and execution of the TIE-IN’s and HOT TAPPING packages following instructions from engineering, iso metric drawings, piping plans and P&ID’s.


2014 – 2015       VONE / HYUNDAICONSORTIUM


Piping Supervisor
Career summary:

Planning with engineers, construction activities of the project and reviewing proper field piping installation to:
• Establish and defining methods to the risk control.
• Ensured that all staff complies with the requirements of the work processes.
• Apply precautions and safety procedures required and implemented in the workplace.
• Ensure the implementation of specific security plans, health and environment during the execution of the activities.
• Execution activities according to the Work Risk Analysis and evaluation techniques with the Safety Coordinator.
• Explain to the staff about the risks involved in the activities.
• Management of the resources at field .



2011      REPRESENTACIONES DCL.      Bolívar Estate, Venezuela.

Career summary:
Shipping and Logistic Coordinator (April 2011- November 2011).
I was in charge to handle and manage resources to make the logistics processes of shipping for export material in bulk.



1999–2011 ORINOCO IRON .   Bolívar Estate, Venezuela.

Career summary:
Superintendent of Procurement and shipping (2010- January 2011)
• I was in charge to handle and manage resources to purchase industrial goods, cost analysis as well as the logistics of shipping for export and import.

Supervisor  of Sales Administrative Services (2007- 2010).
Coordinated with Sales Managers to:
• Prepare sale budget and maintain/improve budget limitations to meet plant’s annual objectives and standards according to sales projections.
• Monitor production vs. sales to review production schedule accordingly. Ensure enough replenishments of finished goods supply.
• Apply effective modification on production plan for timely production of special orders or promotional items.
• Coordinates with procurement officers to ensure smooth supply of raw materials.
• Establishes quality control standards and procedures. Ensures strictly adherence to those standards (ISO 9001 2000).
• Management of complaints, supporting Post Sale Technical Manager

QA/QC  Supervisor (2006-2007).
• I was staff to the Superintendent of Inspection and Corrosion of Technical Management. I was responsible for coordinating the inspection of static equipment during operations to ensure the reliability of the company (predictive inspections in opportunity) to avoid out of schedules shut downs. Not accidents record during my management.


QA/QC  Coordinator (Shut down)  (2004-2006) 
• I was staff of the Shut Down Superintendence. I was responsible for leading an inspector’s staff and activities during plant shut downs to ensure the reliability of the equipments during normal operations, detecting out deviations in opportunity to prevent delays and unscheduled shut downs after Start Ups

Coordinator of mechanical installations (2001-2004)
• I managed construction contractor staff to ensure the successful start up of the module 2 within budget and schedule as planned.
• I received a special gratitude award from my staff (104 people) for the way I handed and gave the instructions to meet project objectives. Not disabling accidents. From the workers of the companies T.D.A, Montiven, Pirca and OI who participated in the Commissioning and start up of Modulo II of Orinoco Iron, showing gratitude to Cristóbal Méndez, for the enormous technical and moral support and leadership to achievement  our objective without any fatal accident or lost time due to Injury.  “Security and Productivity go hand in hand”.  09/20/2003

Maintenance Coordinator (2001)
• I held the position of “Maintenance Coordinator”  in the mineral handling area, to performance a substitution for vacation during 32 days.


Mechanical Maintenance Engineer I (1999-2001)
• Collect information about the behaviour of equipment from the mechanical point of view using non-destructive testing and vibration analysis. The most widely used non-destructive testing are: " thickness, ultrasound analysis, inspection with eddy current equipment, welding inspection, spot check and X-rays. "
• Supervised permanent staff and temporary staff to achieve the required quality in their work and parts and components produced and / or repaired in-house or acquired from third parties, following rules and procedures.
• Participated in twenty (20) plant shutdowns, with the maintenance engineering group, responsible for mechanical inspections of reactors, gas plant, hydrogen plant and auxiliary equipment, ensuring successful plant start-ups.. 

1999  PIVENSA             Bolívar Estate, Venezuela

Thesis in mechanical engineering.
• I designed a hydraulic test bench for production management of that company.
           
           
           
1997-1998                VENALUM             Bolívar Estate, Venezuela
            

Mechanical Engineering Intern.
• Redesigned mechanical equipment in the fume treatment plant and dense phase system of "Experimental V-350 Cells. " Research and Development Center of the company.
• Perform manual installation of the "Experimental V-350 Cells. " Research and Development Center of the company.

1 comment:

  1. After reading this post, I learned a lot about fume extractor System In india processes and maintenance. I request the writer to post more blogs like this. This post helped me out and every sentence is written carefully.

    ReplyDelete

 

Sample Text

 
Blogger Templates