EMPLOYMENT HISTORY
2015 –
Present SK & EC
Piping Supervisor
Planning
with engineers, construction activities of the project and reviewing proper
field piping installation to:
• Provide
direct leadership to the Piping and Welding Team, ensuring that polices and
procedures are followed and best practices are implemented
• Coach,
mentor and promote the development of direct reports and proactively address
technical and behavioural performance concerns
• Effectively
manage the budget and staffing schedule of the Piping and Welding Team, as well
as capital projects work assigned to the Asset Integrity department
• Implement
the installation program within the plant area, supervise shutdowns,
turnarounds and manage unplanned breakdowns
• Regularly
communicate progress and issues associated with the Piping and Welding Team to
the Manager, Asset Integrity and other stakeholders as assigned
•
Supervise the HYDRO TEST packages be
completed in field on time and making the logistic to the documents without
delays.
• PUNCH
CLEARER, Able to
make contribution and make decisions in actions that require immediate
solutions.
•
Identification and execution of the TIE-IN’s
and HOT TAPPING packages following instructions from engineering, iso
metric drawings, piping plans and P&ID’s.
2014 – 2015 VONE / HYUNDAICONSORTIUM
Piping Supervisor
Career
summary:
Planning
with engineers, construction activities of the project and reviewing proper
field piping installation to:
• Establish
and defining methods to the risk control.
• Ensured
that all staff complies with the requirements of the work processes.
• Apply precautions
and safety procedures required and implemented in the workplace.
• Ensure
the implementation of specific security plans, health and environment during
the execution of the activities.
• Execution
activities according to the Work Risk Analysis and evaluation techniques with
the Safety Coordinator.
• Explain
to the staff about the risks involved in the activities.
• Management
of the resources at field .
2011 REPRESENTACIONES DCL. Bolívar Estate, Venezuela.
Career
summary:
Shipping and Logistic
Coordinator (April 2011- November 2011).
I was in
charge to handle and manage resources to make the logistics processes of
shipping for export material in bulk.
1999–2011 ORINOCO IRON . Bolívar Estate, Venezuela.
Career
summary:
Superintendent of
Procurement and shipping (2010- January 2011)
• I was
in charge to handle and manage resources to purchase industrial goods, cost
analysis as well as the logistics of shipping for export and import.
Supervisor of Sales Administrative Services (2007-
2010).
Coordinated
with Sales Managers to:
• Prepare
sale budget and maintain/improve budget limitations to meet plant’s annual
objectives and standards according to sales projections.
• Monitor
production vs. sales to review production schedule accordingly. Ensure enough
replenishments of finished goods supply.
• Apply
effective modification on production plan for timely production of special
orders or promotional items.
• Coordinates
with procurement officers to ensure smooth supply of raw materials.
• Establishes
quality control standards and procedures. Ensures strictly adherence to those
standards (ISO 9001 2000).
• Management
of complaints, supporting Post Sale Technical Manager
QA/QC Supervisor (2006-2007).
• I was
staff to the Superintendent of Inspection and Corrosion of Technical
Management. I was responsible for coordinating the inspection of static
equipment during operations to ensure the reliability of the company
(predictive inspections in opportunity) to avoid out of schedules shut downs.
Not accidents record during my management.
QA/QC Coordinator (Shut down) (2004-2006)
• I was
staff of the Shut Down Superintendence. I was responsible for leading an
inspector’s staff and activities during plant shut downs to ensure the
reliability of the equipments during normal operations, detecting out
deviations in opportunity to prevent delays and unscheduled shut downs after
Start Ups
Coordinator of mechanical
installations (2001-2004)
• I
managed construction contractor staff to ensure the successful start up of the
module 2 within budget and schedule as planned.
• I
received a special gratitude award from my staff (104 people) for the way I
handed and gave the instructions to meet project objectives. Not disabling
accidents. From the workers of the companies T.D.A, Montiven, Pirca and OI who
participated in the Commissioning and start up of Modulo II of Orinoco Iron,
showing gratitude to Cristóbal Méndez, for the enormous technical and moral
support and leadership to achievement
our objective without any fatal accident or lost time due to
Injury. “Security and Productivity go
hand in hand”. 09/20/2003
Maintenance Coordinator
(2001)
• I held
the position of “Maintenance Coordinator”
in the mineral handling area, to performance a substitution for vacation
during 32 days.
Mechanical Maintenance
Engineer I (1999-2001)
• Collect
information about the behaviour of equipment from the mechanical point of view
using non-destructive testing and vibration analysis. The most widely used non-destructive
testing are: " thickness, ultrasound analysis, inspection with eddy current
equipment, welding inspection, spot check and X-rays. "
• Supervised
permanent staff and temporary staff to achieve the required quality in their
work and parts and components produced and / or repaired in-house or acquired
from third parties, following rules and procedures.
• Participated
in twenty (20) plant shutdowns, with the maintenance engineering group,
responsible for mechanical inspections of reactors, gas plant, hydrogen plant
and auxiliary equipment, ensuring successful plant start-ups..
1999 PIVENSA Bolívar Estate, Venezuela
Thesis in
mechanical engineering.
• I
designed a hydraulic test bench for production management of that company.
1997-1998 VENALUM Bolívar Estate, Venezuela
Mechanical
Engineering Intern.
• Redesigned
mechanical equipment in the fume treatment plant and dense phase system of
"Experimental V-350 Cells. " Research and Development Center of the
company.
• Perform
manual installation of the "Experimental V-350 Cells. " Research and
Development Center of the company.
After reading this post, I learned a lot about fume extractor System In india processes and maintenance. I request the writer to post more blogs like this. This post helped me out and every sentence is written carefully.
ReplyDelete